Buyer Guide
How to Order Custom Patches: A B2B Buyer Checklist
Reviewed:
Prepare artwork and order details before requesting a custom patch quote.


Short Answer
Ordering custom patches follows one checklist: choose the product type, send artwork, confirm size and construction, confirm quantity from 100 pcs per design, review the quote, approve a sample in 3-7 days, and move to bulk production in 7-15 days after the artwork and order details are confirmed.
Ordering Checklist
| Step | Buyer Detail | Why It Matters |
|---|---|---|
| 01 | Choose product | Embroidered, woven and PVC construction have different visual results. |
| 02 | Send artwork | Artwork helps review shape, detail, color and text clarity. |
| 03 | Confirm size and construction | Size, border, backing and material affect the quote and production plan. |
| 04 | Confirm quantity | MOQ starts from 100 pcs per design. |
| 05 | Review quote | The quote can reflect product type, artwork details and packing needs. |
| 06 | Sample / approval | Sample lead time is typically 3-7 days when a sample is arranged. |
| 07 | Production and QC | Bulk production is typically 7-15 days after artwork and order details are confirmed. |
What to Prepare
Prepare product type, artwork file or reference image, finished size, backing or hardware, quantity, packing needs and destination country.
What Happens After You Send Artwork
The order flow starts with an artwork-first review: the custom patches team checks the artwork against the product type, size, colors, backing and finishing details before anything is produced. For embroidered patches the design is digitized for the finished size; for woven patches it is separated; and for PVC patches the mold preparation is reviewed from the artwork. This is the stage where readability, edge finish and attachment are confirmed, so the sample round is not wasted on the wrong construction.
After review, the sample is produced in the typical 3-7 day window, and bulk production follows the approved artwork and order details. Finished pieces are checked against the approved artwork, size, color, backing, hardware and finishing details before packing — the same checks described on the quality control page.
How to Prepare Artwork for an Accurate Quote
The fastest way to an accurate quote is to remove the open questions before the first request: state the product type, the finished size (longest side in mm or inches), the quantity, the backing or hardware, and the destination country. If the artwork contains very small text, note the smallest letter size, because readability depends on the construction. When one emblem will run at several sizes — a cap patch, a chest emblem and a jacket back — prepare each finished size as its own artwork file, since embroidered digitizing and woven separation are size-specific. The patch size guide lists typical placement ranges, and the manufacturing process guide shows where each preparation step sits in production.
Timeline, Samples and Reorder Planning
Plan the calendar around the two confirmed windows: samples typically 3-7 days after the artwork and specifications are confirmed, and bulk production typically 7-15 days after order details are confirmed, with MOQ from 100 pcs per design. Rush timing can be reviewed by product type, current schedule and material availability at the time of the request. For repeat programs, keep the approved artwork and order details from the last run, because reorders start from the same specification instead of repeating the artwork review from scratch — see the MOQ and lead time guide for the full picture.
Frequently Asked Questions
What information should I send with my first enquiry?
Send product type, artwork file or reference image, finished size, quantity, backing or hardware, packing needs and destination country. Adding the intended use and surface helps the review recommend the right construction and attachment.
Do I need finished vector artwork to request a quote?
No. A reference image is enough to start the review. The team can confirm what format and level of detail are needed for production during the artwork-first review, so send the best file you have and note the design intent.
How long does a sample take?
Samples are typically produced in 3-7 days after the artwork and specifications are confirmed. Rush timing can be reviewed when available, based on the product type and current schedule.
When does bulk production start?
Bulk production typically runs 7-15 days after artwork and order details are confirmed. Approving a sample first is the normal path, and production follows the approved artwork so the finished pieces match what was sampled.